A laundry designed to process 1,000 hotel linen sets per day is a typical medium-scale operation. The figures below are planning estimates based on Chinese market conditions and should be replaced with local quotations, utility tariffs, labor costs and customer contracts before any investment decision.
One standard hotel linen set may include one sheet, one duvet cover, two pillowcases, one bath towel, one hand towel and one bath mat. A daily volume of 1,000 sets is approximately 3–5 metric tons, depending on linen weight and the mix of rooms and towel products.
The original Chinese estimate places equipment investment at approximately RMB 800,000–1.5 million. The final amount depends on capacity, automation level, heating method, brand, configuration and whether equipment is new or used.
A plant of this size may require about 300–500 square meters for sorting, washing, drying, finishing, storage, utilities and administration. The production layout should include safe drainage, ventilation, electrical capacity, steam piping, fire protection and wastewater treatment. The source estimate for first-year rent, modification and infrastructure is RMB 300,000–750,000.
Major monthly costs include labor, water, electricity, steam or gas, chemicals, packaging, delivery, maintenance and administration. The source article estimates a team of roughly 8–12 people and total monthly operating costs of RMB 120,000–220,000. Actual staffing depends heavily on the level of feeding, folding and stacking automation.
Using an illustrative service price of RMB 8–14 per linen set and 26 operating days per month, gross monthly revenue could range from about RMB 208,000 to RMB 364,000. However, utilization, customer mix, payment terms, rewash rates, linen-loss responsibility and regional competition can materially change the result.
The source article suggests a possible annual net profit of RMB 500,000–1.5 million under normal operation, with an estimated payback period of about 1.5–3 years. These are not guaranteed returns.
Important: This article is for preliminary planning only and is not financial advice. A feasibility study should use verified local prices, contracts, regulations and equipment quotations.